{"id":3605,"date":"2022-12-19T11:57:59","date_gmt":"2022-12-19T11:57:59","guid":{"rendered":"https:\/\/www.metaltechnology.com\/?p=3605"},"modified":"2022-12-19T11:57:59","modified_gmt":"2022-12-19T11:57:59","slug":"enhancing-student-living-in-belfast","status":"publish","type":"post","link":"https:\/\/www.metaltechnology.com\/enhancing-student-living-in-belfast\/","title":{"rendered":"Enhancing student living in Belfast"},"content":{"rendered":"<p>Aster House student accommodation has been recently completed by\u00a0Farrans Construction\u00a0for Chicago-based client\u00a0CA Ventures\u00a0(managed by its in-house property management company,\u00a0Novel Student), offering a mixture of 253 en-suite bedrooms and studios across five-storeys.<\/p>\n<p>A stylish and peaceful \u2018green\u2019 living space echoing the nearby Botanic Garden, the building provides its residents the ideal escape from the fast pace of university life. Beautifully furnished rooms, games areas, communal lounges, a gym and a karaoke room, make Aster House a sought-after home for students.<\/p>\n<p>Described by Farrans as a \u201ctechnically challenging\u201d and \u201ccomplex\u201d build, the company\u2019s design responsibility extended to dealing with the planning authority along with responsibility for fire and, importantly, acoustic considerations due to the nearby railway. There was also an agreement with Translink not to impact on the public transport route.\u00a0Metal Technology Ltd\u2019s architectural glazing products were specified via approved fabricator\u00a0D &amp; K Architectural Systems Ltd, to deliver the following high-performance characteristics required of the build:<\/p>\n<p>&#8211; Thermal requirements require a u-value of 1.4w\/m2k to be delivered across the built glazed fa\u00e7ade.<\/p>\n<p>&#8211; Onerous 46dB RW Acoustic performance required of the project fa\u00e7ade due to its location to motorway traffic 24\/7.<\/p>\n<p>Metal Technology products used in the scheme were: System 17 Curtain Walling, System 5-35Hi+ Thermal Tilt &amp; Turn Windows, System 5-20DHi+ Thermal Heavy-Duty Doors and System 23 Glazed-In Louvres.<\/p>\n<p>A very rewarding project to have been involved in, bringing much needed, high quality student accommodation to Belfast. For more information on our solutions for the student accommodations market please follow <a href=\"https:\/\/www.metaltechnology.com\/?openBrochure=student\" target=\"_blank\" rel=\"noopener\">this link to our dedicated brochure and case studies<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-3608\" src=\"https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2022\/12\/Aster_1.jpg\" alt=\"\" width=\"1018\" height=\"667\" srcset=\"https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2022\/12\/Aster_1.jpg 1018w, https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2022\/12\/Aster_1-300x197.jpg 300w, https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2022\/12\/Aster_1-768x503.jpg 768w\" sizes=\"(max-width: 1018px) 100vw, 1018px\" \/><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aster House student accommodation has been recently completed by\u00a0Farrans Construction\u00a0for Chicago-based client\u00a0CA Ventures\u00a0(managed by its in-house property management company,\u00a0Novel Student), offering a mixture of 253 en-suite bedrooms and studios across five-storeys. A stylish and peaceful \u2018green\u2019 living space echoing the nearby Botanic Garden, the building provides its residents the ideal escape from the fast pace [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":3606,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/posts\/3605"}],"collection":[{"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/comments?post=3605"}],"version-history":[{"count":2,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/posts\/3605\/revisions"}],"predecessor-version":[{"id":3609,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/posts\/3605\/revisions\/3609"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/media\/3606"}],"wp:attachment":[{"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/media?parent=3605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/categories?post=3605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/tags?post=3605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}