{"id":4953,"date":"2025-10-17T15:06:33","date_gmt":"2025-10-17T14:06:33","guid":{"rendered":"https:\/\/www.metaltechnology.com\/?p=4953"},"modified":"2025-11-20T15:10:31","modified_gmt":"2025-11-20T15:10:31","slug":"a-flagship-secondary-school-for-northern-ireland","status":"publish","type":"post","link":"https:\/\/www.metaltechnology.com\/a-flagship-secondary-school-for-northern-ireland\/","title":{"rendered":"A flagship secondary school for Northern Ireland"},"content":{"rendered":"\n<p>In September of this year, St Ronan&#8217;s College officially opened its brand new \u00a358 million campus in Lurgan. Delivered by Glasgiven Contracts, the purpose-built campus combines the college&#8217;s three previous locations into one state-of-the-art facility, accommodating\u00a01,750 pupils.<br><br>A\u00a0range of Metal Technology&#8217;s architectural glazing products were fabricated and installed in the flagship project by D &amp; K Architectural Systems.\u00a0The new 20,000 sqm college features\u00a0inspiring classrooms and specialist learning spaces, a dedicated sixth-form centre, a double-height dining hall, and extensive sports and community amenities.\u00a0<\/p>\n\n\n\n<p><a href=\"https:\/\/www.metaltechnology.com\/projects\/st-ronans-college\/\">See full case study ><\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" src=\"https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2025\/10\/MT_St_Ronans_6-1024x682.jpg\" alt=\"\" class=\"wp-image-4937\" srcset=\"https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2025\/10\/MT_St_Ronans_6-1024x682.jpg 1024w, https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2025\/10\/MT_St_Ronans_6-300x200.jpg 300w, https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2025\/10\/MT_St_Ronans_6-768x512.jpg 768w, https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2025\/10\/MT_St_Ronans_6-1536x1024.jpg 1536w, https:\/\/www.metaltechnology.com\/wp-content\/uploads\/2025\/10\/MT_St_Ronans_6.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>In September of this year, St Ronan&#8217;s College officially opened its brand new \u00a358 million campus in Lurgan. Delivered by Glasgiven Contracts, the purpose-built campus combines the college&#8217;s three previous locations into one state-of-the-art facility, accommodating\u00a01,750 pupils. A\u00a0range of Metal Technology&#8217;s architectural glazing products were fabricated and installed in the flagship project by D &amp; [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":4938,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/posts\/4953"}],"collection":[{"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/comments?post=4953"}],"version-history":[{"count":1,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/posts\/4953\/revisions"}],"predecessor-version":[{"id":4954,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/posts\/4953\/revisions\/4954"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/media\/4938"}],"wp:attachment":[{"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/media?parent=4953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/categories?post=4953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.metaltechnology.com\/wp-json\/wp\/v2\/tags?post=4953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}